PowerGen Renewable Energy & Finlays: Load Shedding
The Finlay tea estate management wanted to be able to provide all their worker with access to electricity, and brought PowerGen in to develop and manage this electrification project. They needed to ensure that connecting 8,000 households to their network could be done without putting at risk their production schedule.
Learn More